Srinagar, June 9 (APAC Media): The Zojila Tunnel, regarded as the world’s longest single-tube bi-directional road tunnel at the highest altitude, achieved its final breakthrough on Tuesday, marking a major milestone in India’s infrastructure development journey.Â
Union Minister for Road Transport and Highways Nitin Gadkari attended the breakthrough ceremony along with Jammu and Kashmir Lieutenant Governor Manoj Sinha and Chief Minister Omar Abdullah.Â
Developed by Megha Engineering and Infrastructure Limited (MEIL), the 13.153-km tunnel is being constructed between Baltal in Sonamarg and Meenamarg in the Drass-Kargil region.Â
The project is aimed at providing all-weather connectivity between Kashmir and Ladakh through one of the country’s most challenging mountainous terrains. The breakthrough marks the completion of excavation work on the tunnel.Â
Officials indicated that the project is likely to become operational within the next two years following the completion of remaining construction and finishing works.Â
Situated at an altitude of 11,578 feet above sea level, the tunnel is being hailed as a landmark engineering achievement in India’s mountain infrastructure sector. The route currently faces frequent disruptions during winter months due to heavy snowfall, avalanches, and extreme weather conditions.Â
Once completed, the tunnel will provide uninterrupted year-round access between Srinagar and Ladakh, significantly improving connectivity to Drass, Kargil, Leh, and nearby regions.Â
Officials noted that the tunnel will strengthen both civilian and defence mobility by ensuring reliable access through a strategically important corridor. The project is expected to play a key role in improving transportation efficiency, boosting regional development, and enhancing operational preparedness in a sensitive border region.Â
Also Read:Â
Dharavi Redevelopment Plan to Feature India’s First Multi-Modal Transport Hub




































